Additional information
Weight | 300 kg |
---|---|
Colour | Black, Orange |
Ideal for training all breeds of gundog, by keeping them within 9m of the handler. The PVC material runs smooth amongst vegetation to eliminate snagging. The 70mm dog clip attaches straight on to one of our 6mm, 8mm slip leads or our training slip collar.
£24.95
Weight | 300 kg |
---|---|
Colour | Black, Orange |